• Gantry Crane for Railway Construction 50-900ton Hydraulic System
  • Gantry Crane for Railway Construction 50-900ton Hydraulic System
  • Gantry Crane for Railway Construction 50-900ton Hydraulic System
  • Gantry Crane for Railway Construction 50-900ton Hydraulic System

Gantry Crane for Railway Construction 50-900ton Hydraulic System

After-sales Service: 24h Online
Certification: CE
Condition: New
Maximum Lifting Weight: >200t
Maximum Lifting Height: 20-25m
Operation Form: Cabin
Customization:
Diamond Member Since 2022

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
Gantry Crane for Railway Construction
Type
Common Gantry Crane
Main Girder Form
Single Girder
Transport Package
Standard
Trademark
china
Origin
China

Product Description

Gantry Crane for Railway Construction 50-900 tons

Product Name: Gantry Crane for Railway Construction

Lifting capacity: 50-900 tons

Span: 4-18m

Lifting height: 1.2-22m

The gantry crane is specially designed for the span beam/bridge moving and transport for railway construction.

Description

The gantry crane for railway construction is specially designed for the concrete span beam/bridge moving and transport for railway construction. Users can use 2 cranes 500t (450t) or 1 crane 1000t (900t) with 2 lifting points to handle railway beam.

Gantry Crane for Railway Construction 50-900ton Hydraulic SystemThis railway construction gantry crane consists of main girder, rigid and flexible supporting leg, travelling mechanism, lifting mechanism, electric control system, hydraulic system, driver cabin, railing, ladder and walking plat.
Gantry Crane for Railway Construction 50-900ton Hydraulic System

Features of Gantry Crane for Railway Construction:

1. Rubber tire type and rail-mounted type;

2. Hydraulic driven of walking, steering and lifting;

3. Walk straight, oblique and rampage;

4. Good adaptability, high working efficiency, small space occupied;

5. Special spreader mainly used for lifting and transporting large concrete beam/bridge;

6. two cranes, 2 trolleys with max lifting height 30m;

7. The max wheel load is 22t when lifting 900t stuff;

8. 90° shift for rail type crane to achieve horizontal or vertical walking;

9. 4 points for lifting and 3 points for balance to ensure even stress of the steel wire rope;

10. Accurate positioning for stuff lifting down;

11. Hydraulic push for trolley to realize various lifting and save the cost;

12. For the 4 hoists, it can be single use or combine use of 2 or 4 hoists while the hardware and software are interlocked for operation safety.
Gantry Crane for Railway Construction 50-900ton Hydraulic System

Gantry Crane for Railway Construction 50-900ton Hydraulic System
 
>>> FAQ
If you are interested in our products, please no hesitate to contact us with following parameters:
1.Lift capacity?
2.Lift height?
3.Power supply?
4.Crane travel length ?
5.Lifting objects?
More details or drawings, the better.
Notes: The parameters can be customized according to your specific needs.

After your selection
1. We will count cheapest shipping cost and make invoice to you at once.
2. Test each machine before delivery to ensure their quality, then send out to you after your
payment.

After-sale Service
1. Installation service of overhead crane available with:
Video tutorial support for whole installation process.
7/24 remote assistance for crane installation guidance and commissioning.
2. We are very glad that customer give us some suggestion for price and products.
3. If you have any question, please contact us freely by E-mail or Telephone

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now